3-Channel CMT Assembly
CMT Multilevel System Pre-installation Requirements
Introduction
Preparation
Assembling Standard CMT Multilevel Systems
Marking and Cutting the Tubing
Cutting the Outer Ports and Vent Holes
- Step 8) Install the Port Cutting Guide
- Step 9) Use Cutting Bolts to Cut Holes
- Step 10) Cut Panel Between Upper Two Port Holes
- Step 11) Insert Expansion Plug
- Step 12) Install the Well Screen
- Installing Oetiker Clamps
- Step 13) Line-up Port Cutting Guide
- Step 14) Create Port 2 Opening
- Step 15) Finish Constructing Port 2
- Step 16) Construct Port 3
Configuring the Bottom of the CMT Tubing (Zone 7)
CMT Placement
CMT Installation with Sand and Bentonite Cartridges
- Introduction
- Installation Design Example
- Preparation
- Installation
- Port Assembly
- Installing Sand Cartridges
- Installing Spring Cartridges