Transfer your desired port layout onto the CMT Multilevel System tubing as described on Pages 4 and 5 of the ‘3-Channel CMT Assembly Section’. Place Sand and Bentonite Cartridge Assemblies along side the CMT tubing (see Figure 28) in the order as shown on your layout. Be sure to include at the bottom of each Cartridge, a Spacer, Separator Disk, and Gear Clamp.
When using Betonite Cartridges, it is necessary to start at the middle port (Port 2 in our example) and then install the Bentonite Cartridges on either side of that port, before making the other ports.
The Bentonite Spring Cartridges will NOT physically slide over port screen and clamped assemblies. Thus, the progress of CMT Assembly will be outward from the middle port (Port 2 in our example) and towards Ports 1 and 3. Sand Cartridges can slide over a completed port to cover a screen assembly.
Figure 28 – Place Sand and Bentonite Cartridge Assemblies along side the CMT Multilevel System Tubing