CMT Multilevel System Pre-installation Requirements
- Minimum information required for effective design of the CMT Multilevel System
- Ensure that these additional items are available on site during installation
Introduction
Preparation
Assembling Standard CMT Multilevel Systems
Marking and Cutting the Tubing
Cutting the Outer Ports and Vent Holes
- Step 8) Install the Port Cutting Guide
- Step 9) Use Cutting Bolts to Cut Holes
- Step 10) Cut Panel Between Upper Two Port Holes
- Step 11) Insert Expansion Plug
- Step 12) Install the Well Screen
- Step 13) Line-up Port Cutting Guide
- Step 14) Create Port 2 Opening
- Step 15) Finish Constructing Port 2
- Step 16) Construct Ports 3 to 6
Configuring the Bottom of the CMT Tubing (Zone 7)
Attaching Tubing Centralizers
CMT Placement
Attaching the Standard Wellhead