Waterloo Multilevel System Pre-installation Requirements
1.0 Introduction
2.0 Installation Components
3.0 Preparation
4.0 Assembling the System
5.0 Joint Connections
6.0 Port Connections
- 6.1 Attaching Open Tubes
- 6.2 Attaching Vibrating Wire Transducers (VWT)
- 6.3 Attaching a Pump (Bladder or Double Valve)
7.0 Testing Monitoring Equipment
8.0 Packer Activation
9.0 Wellhead Manifold Completion
10.0 Monitoring Options
Appendix
- - Waterloo System Installation Field Log
- - Vibrating Wire Transducer Calibration Report
- - Sample Vibrating Wire Calculation
- - Training Terms and Conditions