Waterloo System Installation
Waterloo System Installation
Installation of the Waterloo System starts with the base plug and lowermost sections. The components are joined together in the order required. As each new port is put into position a new monitoring tube, dedicated pump and/or transducer is connected to it. Successive components are threaded over these tubes, building the casing string, until the Waterloo System is complete. Typically, installations are completed in a day, using a 3-4 member team. Solinst can provide Waterloo System training on request.