Table of Contents
Narrow CMT Multilevel System Assembly Manual
-
CMT Multilevel System Pre-installation Requirements
-
Introduction
-
Preparation
-
Assembling Standard CMT Multilevel Systems
-
Marking the CMT Tubing
-
Cutting the Ports and Vent Holes
- Step 8) Install the Port Cutting Guide
- Step 9) Use Cutting Bolts to Cut Holes
- Step 10) Cut Panel Between Upper Two Port Holes
- Step 11) Insert Expansion Plug
- Step 12) Install the Well Screen
- Installing Oetiker Clamps
- Step 13) Line-up Port Cutting Guide
- Step 14) Create Port 2 Opening
- Step 15) Finish Constructing Port 2
- Step 16) Construct Port 3
-
Configuring the Bottom of the CMT Tubing (Zone 7)
-
Narrow CMT Placement
-
CMT Installation with Sand and Bentonite Cartridges
-
CMT Multilevel System Monitoring Options
-
Terms and Conditions