Three Parameters at
the Lowest Possible Cost
Safeguard your project’s success and mitigate any potential for downtime or additional costs.
To purge and sample up to 3 (up to 4 for the 7 Channel CMT System) Micro Double Valve Pumps, at a single location, a Multi-Purge Manifold Assembly is available.
Airflow adjustments are made using the valves on the top of the head assembly of the manifold. A clockwise turn reduces air supply, counter-clockwise increases the air supply. If a valve is all the way down, it is in the off position. Valves can be adjusted by hand, but if they are too tight, a slot head screwdriver can be used.
Figure 24 – Multi Purge Manifold Assembly