Tools and Materials Needed

  1. Laser Tape Seal Plug Brass Tubes Replacement Assembly (#113464) includes:
    • 2 x brass tubes (with o-rings installed)
    • 2 x o-rings
    • Black disk
    • Phillips screw
  2. Phillips screwdriver
  3. Vice grips (optional)
  4.  Pliers
  5. Silicone grease

Instructions

1. Make sure the Water Level Meter is turned off.

2. To remove the probe, twist the probe counter-clockwise and slowly pull it away from the tape seal plug.

Note:  

It will take some force to pull past the o-ring on the tape seal plug. Ensure not to overextend the wire connectors inside the probe.

3. Remove the two connectors from the brass tubes.

4. Remove the screw from the end of the tape seal plug.

if using vise grips do not over tighten as this could damage the solinst meter tape seal plug

Note:  

If using vise grips, do not over-tighten, as this could damage the tape seal plug.

5. Use pliers to pull out the two brass tubes and the black disk from the tape seal plug.

6. If this is a newer style tape seal plug, remove the two o-rings from the openings.

use pliers to pull out the two brass tubes and the black disk from the solinst meter tape seal plug

7. Make sure the wire strands in the tape conductors are centred to ensure a good electrical connection with the new brass tubes.

make sure the wire strands in the tape conductors are centred to ensure a good electrical connection with the new brass tubes

8. Apply a very thin film of silicone grease on one side of a small o-ring. Remove any excess.

9. Install the o-ring over the pointed end of a brass tube. The silicone grease will help hold it in place.

solinst meter tape seal plug brass tube with oring

10. Push the brass tube (pointed end first) into one of the openings in the tape seal plug. Ensure it is pushed in all the way so that it is flush with the end of the tape seal plug.

ensure it is pushed in all the way so that it is flush with the end of the tape seal plug

11. Repeat the process in steps 8-10 to install the second brass tube in the other opening in the tape seal plug.

12. Install the black disk over the brass tubes and use the screw to secure it to the tape seal plug.

Note:  

See the Probe Replacement Instructions for more details; including cleaning, inspecting and replacing the two o-rings on the tape seal plug body, if needed.

ensure the connectors are pushed all the way onto the brass tubes

13. To replace the probe, with the tape facing up, connect the green wire to the brass connector on the top of the tape seal plug and the white wire to the bottom brass tube. Ensure the connectors are pushed all the way onto the brass tubes.

14. Keeping the wires connected, slowly twist the probe up to two times. This shortens the wires and allows them to tuck easier into the probe body, avoiding any nicks.

15. Line up the indents in the probe with the grooves in the tape seal plug. Push the probe past the o-ring, then twist the probe clockwise until the probe seats on the tape seal plug.

16. Test that the Meter is working correctly (see operating instructions, if required). Check the connections if the Meter does not work as expected.

line up the indents in the probe with the grooves in the tape seal plug. push the probe past the o-ring then twist the probe clockwise until the probe seats on the tape seal plug

Related Products

solinst model 407 bladder pumps

Bladder Pumps with Easy to Replace Bladder Cartridges

Solinst Bladder Pumps now feature Santoprene® bladder cartridges that are quick and easy to replace in the field – no tools required. PVC Bladder Pumps are low cost and excellent for metals sampling and in harsh, corrosive environments.

101d water level drawdown meter with power winder installed

101 Power Winder

The 101 Power Winder provides both convenience and ease of use for all Solinst reel-mounted devices. It is lightweight and easy to attach to small, medium or large size Solinst reels, and is simple to adjust to fit other reels in the market. Effortlessly wind longer tape lengths.

(Image shows 101 Power Winder Installed on Solinst Model 101D Water Level DrawDown Meter)

solinst model 104 sonic water level meter

Measure Water Levels
Without Lowering Equipment Down the Well

The 104 Solinst Sonic Water Level Meter is a portable, acoustic ranging instrument designed to simply and quickly provide depth to static water level measurements down to 600 m (2000 ft), without the need to lower equipment down a well. Ideal for straight, crooked, narrow, hard to access, or contaminated wells.

Related Blog Posts

importance of measuring  water level drawdown

The Importance of Measuring Water Level Drawdown

How Using a Levelogger and 101D Water Level DrawDown Meter Together Provides Essential Data.
What is Drawdown? Drawdown is a change in groundwater level due to an applied stress, caused by events such as: Pumping from a well Pumping from a neighbouring well Intensive water taking from local area Seasonal declines as recharge rates lower....