Waterloo Multilevel System Pre-installation Requirements

1.0 Introduction

2.0 Installation Components

3.0 Preparation

4.0 Assembling the System

5.0 Joint Connections

6.0 Port Connections

  1. 6.1 Attaching Open Tubes
  2. 6.2 Attaching Vibrating Wire Transducers (VWT)
  3. 6.3 Attaching a Pump (Bladder or Double Valve)

7.0 Testing Monitoring Equipment

8.0 Packer Activation

9.0 Wellhead Manifold Completion

  1. 9.1 Standard Option
  2. 9.2 Multipurge Option
  3. 9.3 Wellhead Protection

10.0 Monitoring Options

Appendix

  1. – Waterloo System Installation Field Log
  2. – Vibrating Wire Transducer Calibration Report
  3. – Sample Vibrating Wire Calculation
  4. – Training Terms and Conditions